About Water Department |
|
| |
|
|
|
|
|
|
| |
|
|
Water Supply and Sewerage Department is headed by 2 Superintending Engineer (O&M). This Department is also called (O&M). Call i.e. Operation, Maintenance of water supply and Sewerage system in the city. At presently the city has been divided into the 5 division and each division is headed by Corporation Engineer (O&M). Each division is subdivided into eight sub zones which are headed by Assistant Engineer (O&M). The Assistant Engineer are assisted by the Junior Engineer attached with all sub divisions. Assistant Engineer is also called Zonal Officers is to look out the maintenance of Water Supply and Sewerage System of the area falling under their zone and resident of that area write down their complaint with the Zonal Officers located all over the city.
|
| |
|
|
|
|
|
|
| |
|
|
Top on page
|
|
| |
|
|
Status of water supply and sewerage system at Jalandhar. |
|
| |
|
|
|
|
|
|
| |
|
|
Jalandhar is a historic town and the oldest town of Punjab, and is the third largest town of Punjab. |
|
| |
|
|
|
|
|
|
| |
|
|
| WATER SUPPLY (as on ) |
| S no. |
Existing Facilities |
Quantity |
| 1. |
Numbers of existing tube wells |
210 |
| 2. |
Numbers of existing over head tanks (OHSR) |
23 |
| 3. |
Length of existing water supply lines |
693 Kilo meters |
| 4. |
Numbers of water supply connection |
91020 |
| 5. |
Population covered with water supply facilities |
82% |
| SEWERAGE (as on ) |
| S no. |
Existing Facilities |
Quantity |
| 1. |
Numbers of temporary disposal plants |
19 |
| 2. |
Length of existing sewerage |
516 Kilo meters |
| 3. |
Population coverage |
67% |
| 4. |
Numbers of Sewer Connections |
86478 |
|
|
| |
|
|
|
|
|
|
| |
|
|
Top on page
|
|
| |
|
|
How to get Water/Sewer connection ? |
|
| |
|
|
|
|
|
|
| |
|
|
Any owner/ occupier/ consumer can get the water/ Sewerage Connection by applying to Suptd. Water Rate, through the MCJ approved plumbers on the prescribed forms. The labour and the material charges shall be paid by consumer. |
|
| |
|
|
|
|
|
|
| |
|
|
Document to be submitted for new water connection. |
|
| |
|
|
|
|
|
|
| |
A) |
|
Relevant Application form dually completed through approved licensed plumber. |
|
| |
|
|
|
|
|
|
| |
b) |
|
Proof of the ownership of the property. |
|
| |
|
|
|
|
|
|
| |
c) |
|
Copy of Sanctioned plan if new connection on construction basis is required. |
|
| |
|
|
|
|
|
|
| |
d) |
|
House Tax NOC (for commercial connection only) |
|
| |
|
|
|
|
|
|
| |
e) |
|
Copy of full paid bill of existing connection, it additional connection applied for. |
|
| |
|
|
|
|
|
|
| |
|
|
The water connection charges are as under: (Rate per connection) |
|
| |
|
|
|
|
Domestic |
|
Domestic |
|
Construction |
|
| |
|
|
|
|
|
|
| |
|
|
Security |
|
Rs. 75 |
|
RS 125 |
|
RS 125 |
|
| |
|
|
|
|
|
|
| |
|
|
Connection FeeConnection Fee |
|
RS 15 |
|
RS 15 |
|
RS 15 |
|
| |
|
|
|
|
|
|
| |
|
|
Road Cutting charges |
|
As applicable at actual |
|
|
|
Advance @ RS 500 per month minimum for six months |
|
| |
|
|
|
|
|
|
| |
|
|
Document to be submitted for sewer connection. |
|
| |
|
|
|
|
|
|
| |
a) |
|
Prescribed application form duly completed to be submitted through approved licensed plumber. |
|
| |
|
|
|
|
|
|
| |
b) |
|
Copies of plan showing housing unit sewerage arrangement. |
|
| |
|
|
|
|
|
|
| |
c) |
|
Copy of Power of Attorney if required. |
|
| |
|
|
|
|
|
|
| |
d) |
|
House Tax NOC if required. |
|
| |
|
|
|
|
|
|
| |
|
|
The Sewer connection charges are as under: |
|
| |
|
|
|
|
|
|
| |
|
|
|
|
Domestic |
|
Commercial |
|
| |
|
|
|
|
|
|
| |
|
|
Security |
|
RS 25 |
|
RS 25 |
|
| |
|
|
|
|
|
|
| |
|
|
Connection Fees |
|
RS 15 |
|
RS 15 |
|
| |
|
|
|
|
|
|
| |
|
|
Road Cutting |
|
As applicable as actual |
|
|
|
| |
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
Water Supply, Sewerage /Water billing |
|
| |
|
|
|
|
|
|
| |
|
|
| Nature of Complaint |
Area of complaint falling in wards no./ Zone No. |
Name of contact officer/ Designation |
Contact No. |
| Water Supply, Sewerage /Water billing |
Head of the Department |
Sh. A.S. Dhaliwal
(Superintending-Engineer) |
0181-5053072 (O), |
| |
|
99888-24055 |
| |
|
|
|
| |
.............................. |
|
37(p),45,46,47,48,50,52,53,54,55,58,59,60,49(p) Zone No: 4
Basti Sheikh |
Sh. Harvinder Kumar
(CorporationEngineer) |
96461-34660 |
Sh. Nirmal Singh,
Sh. Ravinder Singh
(Assistant Engineer) |
96460-61221 (Nirmal Singh)
9988856699
(Ravinder Singh)
|
24,35,36,37,38,40,41,42,43,44
26(p),23(P) Zone No:3, Backside Mini Lal Rattan Cinema |
Sh. Satnam Singh
(Corporation Engineer) |
98726-55894 |
Sh. Sanjeev Kumar
(Assistant Engineer) |
96460-08435 |
17,18,19,20,23,25,26(P),27,28(P),29,30(P),36(P),24(P)
Zone No:1, Partap Bagh |
Sh. Lakhvinder Singh (Corporation Engineer) |
98036-26260 |
| Sh. Satinder Kumar (Assistant Engineer) |
96460-46223 |
| 1,2,21,22,23,39 Zone No: 2 Dada Colony |
Sh. Narinder Singh (Corporation Engineer) |
94177-10151 |
| Sh. Harmesh Lal (Assistant Engineer) |
98729-58652 |
| |
| 31,32,33,34,55,56,57, Zone No: 6, Model Town |
Sh. Satnam Singh
(Corporation Engineer) |
98726-55894
|
Sh. Baljit Singh Assistant Engineer |
99888-18224 |
| |
| 9,10,11,12,13,14,15,16,30,31,17, Zone No: 5, Company Bagh |
Sh. Sh. P.S.Jaggi (Corporation Engineer) |
98159-66444 (M) |
| |
Sh. Surjit Singh –I
(Assistant Engineer) |
96460-53232(M) |
| |
| |
| |
3,5,6,7,8,9,19, Zone No: 7, Industrial Estate |
Sh. Narinder Singh
(Corporation Engineer) |
94177-10151 (M) |
| Sh. Gurcharan Singh
(Assistant Engineer) |
99883-35328 (M) |
| |
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|